Project Manager: Gleeds | Client: City Grove | Architect: EPR Architects
Engineer: Heyne Tillet Steel | CLW Service: Advisory Role
Advisory role to guide the design team on waterproofing relating to refurbishment to an existing basement.
Waterproofing systems:
Multiple Type C drained cavity systems
Repair of sandwich Type A barrier
Image Credit: Sixty London Wall & EPR Architects